Case Studies

Nov 2018 to Present

British Transport Police

Due to clearance requirements PNM Communications were tasked with supplying NVPP3 cleared engineers at short notice to undertake a structured cabling and APs install to 150+ sites including fibre backbone connectivity. Three weeks from initial consultation our engineers were installing onsite and continue to cable buildings across the BTP UK Estate.

Nov 2018 to Present

Ongoing

Domino’s Pizza

Installation of new structured cabling to 100+ sites, including migration of existing active equipment onto new VMB equipment and WAN circuit and commissioning of new IP telephony system.

18 month project

TUI travel agents

Installation of new structured cabling and cabinet upgrades for WAN upgrade project

18 month project

Ongoing

Bupa Care homes

Installation of new structured cabling and APs sites across UK including fibre backbone connectivity, residents telephony and ongoing break fix works as required.

2001 to Present

Ministry of Defence Dii Project

20 year ongoing worldwide MOD estate LAN upgrade covering campus backbone cabling, building flood wiring, data centre builds, continuous move and changes, building upgrades, civils, PA mast and CCTV tower builds.

2001 to Present

Ongoing

The HUT Group

Cat6A cabling for warehouse and packing environment.

Ongoing

West Mercia Police

Complete copper and fibre upgrade to all West Mercia Constabulary Estate.

Ongoing

28 Month

Yorkshire Building Society

WAN upgrade across entire YBS Estate UK, router, switch and modem configuration and installation.
We can't control the weather, but we can control the schedule, costs, quality & safety.